Our sites

Built in stages. Starting with SY1.

SYNKO is bringing its own GPU data centre capacity online in Sydney, one site at a time — each engineered for dense, high-power AI workloads.

01Stage 1 · Sydney

SY1

In delivery · Opening Q1 2027

SY1 is an established data centre with a high-capacity power connection already in place. Rather than build from scratch, we’re upgrading it end to end — power, cooling, connectivity and security — so it’s ready for dense NVIDIA B300 clusters on a fast timeline.

01

Resilient power

Dual, fully segregated A and B power feeds, a new UPS system and four standby generators, with 3-phase power to every rack.

02

Upgraded cooling

New and upgraded cooling with contained cold aisles, glycol-treated chilled water, backup pumps and dedicated backup DX cooling units.

03

Carrier connectivity

Fibre over two diverse carrier paths, a meet-me room for cross-connects and a separate out-of-band management network.

04

Physical security

Biometric access, a mantrap, upgraded CCTV and intrusion monitoring, all tied into a new building management system.

05

GPU-ready data hall

New wide-format server racks, overhead structured cabling, and floor loading checked for heavy GPU racks.

06

24/7 operations

Run around the clock by our operations partner Amaze, with full commissioning and integrated systems testing before go-live.

02What’s next

More sites on the way.

SY2 and SY3 will extend SYNKO’s capacity. We’ll share details as each site is confirmed — talk to us to register interest in early capacity.

SY2 Coming soon

Details to be announced.

SY3 Coming soon

Details to be announced.

Contact

Let's build what's next.

Reach out about AI computing, IDC hosting, cloud services, or a bespoke deployment across Asia-Pacific.

SEND ENQUIRY info@synko.com.au

🇦🇺 Australia Head office

24-26 Bowden St, Alexandria NSW 2015, Australia